Media item
Construction activities at a new railway
closeLicense
Public Domain Mark
You can copy, modify, distribute and perform the work, even for commercial purposes, all without asking permission.
closeDownload
- MP4 (352x288, sd 10.3 MB): 01/29/129345.129333.WEEKNUMMER292-HR[..].mp4
- MP4 (352x288, hd 19.3 MB): 01/29/129347.129333.WEEKNUMMER292-HR[..].mp4
- WEBM (352x288, sd 10.3 MB): 01/29/129349.129333.WEEKNUMMER292-H[..].webm
- OGV (384x288, sd 3.1 MB): 01/29/129341.129333.WEEKNUMMER292-HR[..].ogv
- OGV (352x288, hd 9.8 MB): 01/29/129343.129333.WEEKNUMMER292-HR[..].ogv
- MPG (352x288, source 12.1 MB): 01/29/129333.WEEKNUMMER292-HRE000183B2.mpg
Week number 29-27
Newsreels in which Dutch subjects of a certain week are presented.
Work around the construction of the railway Schaesberg - Simpelveld ("miljoenenlijntje" (million line)). -Pan over construction site, construction of an overpass railway crossing/traffic 43"; -tunnel under construction 48"; -medium/long railway tunnel, tram with destination Heerlen passes 54"; -workers busy with construction of drainage stystem 1'09";
- Creator:
- Polygoon-Profilti (producer) / Netherlands Institute for Sound and Vision (curator)
- Publication date:
- 31 December 1928
- Length:
- 01:10
- Type:
- video
- Original format:
- User:
- Nederlands Instituut voor Beeld en Geluid